Power cuts don't check your service register first. When a genset fails to auto-start at 2 AM, the customer needs the serial, the AMC status and the last complaint history in one lookup — not a phone call to three people. ServiceFlow keeps every genset ready to answer that call.
Click through the modules — every field below exists in the product for generator dealers.
| Customer | Genset | Stage | Status |
|---|---|---|---|
| Rathi Cold Storage | 125 kVA Diesel | Installation | In Progress |
| Metro Hospital Annex | 2 × 250 kVA Diesel | Load Test | Scheduled |
| Nair Residence | 5 kVA Petrol | Commissioned | Completed |
| Vantage Business Park | 500 kVA Diesel | Quotation | Draft |
Dashboard
A generator isn't a one-time sale — it's a standby machine that has to work on the worst day, and your service desk carries that responsibility long after the invoice is signed. Generic CRMs treat it like any other appliance. It isn't one.
"Not Starting" at midnight during a power cut is the single worst complaint to be slow on. Without instant serial and AMC lookup, your Service Engineer is troubleshooting blind on the phone.
Engine make, alternator make, cooling type — spares for one brand don't fit another. Track it loosely and your engineer shows up with the wrong filter, twice.
A genset sold with Auto Start (AMF) that fails to switch over on mains failure is a warranty claim, an angry customer and a site visit — if you even know which units have it enabled.
Commercial and industrial contracts expect proof of periodic load testing. "We did it" without a dated record doesn't hold up when a genset fails during an actual outage.
Engine oil, filters, AVM pads, exhaust bellows — small parts on every service call that either get forgotten on the bill or billed without any record of what was actually used.
A 4-visit annual AMC with 1 done and 3 forgotten looks fine until the customer calls asking why nobody's been out in nine months.
Forward any enquiry email — from IndiaMart, TradeIndia, JustDial, or your own inbox — and ServiceFlow's AI reads the whole message and builds a complete lead automatically. No copy-paste, no manual data entry.
Name, phone, site location, kVA requirement and urgency — pulled straight from the message body into your CRM.
Tags fuel type, phase and features like AMF/auto-start and soundproof canopy automatically — instead of dumping every genset enquiry into one generic lead.
By the time you check your CRM, the enquiry is already logged, tagged and ready for follow-up — never lose a lead to a missed forward again.
A generator record isn't just "kVA rating." It's the engine, the alternator, the fuel system and the features that decide what a breakdown call needs before anyone drives out.
| Serial | GEN125-2026-00541 |
| Engine Make / Alternator Make | Kirloskar / Stamford |
| Cooling | Water Cooled |
| Canopy / Auto Start (AMF) | Yes Yes |
| Fuel Tank | 250 L |
| Warranty | In warranty — 1y 4m left |
Every genset ships with a starter consumables list grounded in a real installation and service call, so nothing gets forgotten between the visit and the invoice.
| Material | Qty | Unit | Amount |
|---|---|---|---|
| Engine Oil | 12 | litre | To be billed |
| Oil Filter | 1 | numbers | To be billed |
| Fuel Filter | 2 | numbers | To be billed |
Ten real complaint types route a call to the right fix before your Service Engineer even leaves the workshop.
| Type | Auto Shutdown / Tripping |
| Product | 62.5 kVA Diesel Genset |
| Serial | GEN62-2025-00219 |
| AMF / Auto Start | Enabled — shutdown after 40s |
| Commissioned | 18 Nov 2025 · 9 months ago |
| Warranty | In warranty — 1y 3m left |
| Likely cause | Low lube-oil pressure trip · needs on-site check |
Generator warranty defaults to two years — short enough that renewal and AMC conversion timing actually matters.
| Service | Default charge | Free service |
|---|---|---|
| Installation & Commissioning | ₹0 | Yes |
| Routine Service | ₹1,500 | Yes |
| Oil & Filter Change | ₹1,200 | Yes |
| Load Test | ₹2,500 | No |
| Engine Overhaul | Quoted per job | No |
A genset earns its keep during the outage nobody scheduled. An AMC with a missed visit or an undocumented load test is a liability the day it's actually needed — track it here instead of a wall calendar.
We'll load your genset catalogue, engine and alternator makes, consumables list and AMC schedule, and have your Service Engineers running before your next load test.